86-135 8757 1010

How to debug the automatic dispenser to achieve the best running condition

Oct 09, 2019

1. Place the glued syringe into the syringe holder and secure it. For example, if the AB glue is installed, the A glue and the B glue are respectively connected from the pressure barrel to the glue guns A and B into the rubber mouth, and the A and B glues are mixed respectively through the three-way to the mixing tube, and the glue mixing degree is determined by the length of the mixing tube. Just control the pressure bar to control the glue on and off. A series of left and right rotary blades are arranged vertically in the casing. The A and B glues are continuously cut and overlapped into a uniform mixture through the mixing tube to ensure the amount of glue. accurate.

 

Visual Automatic dispenser 

 

2. Connect the air valve, connect the dispensing controller port of the dispenser to the syringe through the air pipe, connect the syringe valve to the AIRIN of the dispensing controller, and connect the cable of the dispenser and the dispensing controller. line.

 

3. Connect the dispensing interface of the dispenser to the signal input interface of the dispensing controller through the cable, and connect the foot pedal to the operating interface of the dispensing machine to control the operation of the dispensing machine. Connect the Z-axis connection cable plug to the dispenser Z-axis. If the dispensing controller used is the same as the connector of the dispenser, the dispensing and dispensing ports of the dispenser can be seen according to the number of cores of the connector. Two-core dispensing and three-core operation.

 

4. Select the handheld programmer through the serial cable to the interface on the left side of the dispenser. If the dispensing controller used is different from the connector on the back of the dispenser, you can follow the instructions of the dispensing controller. Preparation and connection.